This phase provides 12,000 additional square feet of manufacturing space by extending the back side of Building 1. The photos above and below – taken last month – show that the concrete floors have been poured for the two-story structure, and the steel roof (protected by a coating of an aluminum-zinc alloy called GALVALUME) has been installed. All entry doors have been installed, and you can see (below) the openings for the building’s two interior staircases.